You don't have javascript enabled. Good luck with that.
Pencarian
Pendanaan Park and Ride Dilakukan Dengan Cara Buy Back

City to Build Park and Ride Through Buy Back System

Jakarta Provincial Government is scheduled to build a park and ride in some regions in the capital. As planned, its construction will use buy back system. 

We use buy back system

Head of Jakarta Transportation Dept, Andri Yansyah explained, through buy back system, the city would pay fund for park and ride project after physical project is done.

"We use buy back system. Construction is handed by the contractor and operator lies in us. Fund for its construction will be paid by way of installments of income," he stated, at City Hall, Monday (10/3).

Park and Ride Design Has Been Made

According to him, until now, the project is still under permit processing. So far, permit processing has been through two institutions, namely BPTSP and Jakarta Water Management Dept.

"We've coordinated with Water Management Dept about recommendation permit applicants related with parking project on the drains," he told.

Andri added, related with park and ride building provider, it was set on performance-based contract such as has been done in Electronic Road Pricing (ERP).

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye786 personAldi Geri Lumban Tobing
  2. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye557 personAldi Geri Lumban Tobing
  3. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye545 personFakhrizal Fakhri
  4. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye526 personAldi Geri Lumban Tobing
  5. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye525 personDessy Suciati